CONSTRUCTION PROCEDURES
Detailed procedures and guidelines for each type of construction work. (Login required)
Procedure No.: 2.10 - Hot Works
1.0 Purpose To ensure adequate protection to people and plant during hot work operations 2.0 Scope All business locatio
Procedure No.: 2.11 - Respirable Crystalline Silica
1.0 Purpose Protect employee health and comply with OSHA regulation (29 CFR 1926.1153) PEL: 50 μg/m³ (8-hour TWA) AL: 25
Chapter – 3 - ENVIRONMENT
Procedure No.: 3.1 - Discharge of Water
1.0 Purpose To protect natural waters 2.0 Scope All business locations under HSC control, where there is a risk of ecol
Procedure No.: 3.2 - Air Emissions Control
1.0 Purpose To ensure that air emissions are controlled to legal requirements. 2.0 Scope This document is the minimum r
Procedure No.: 3.3 - Waste Management
1.0 Purpose To ensure effective management of waste, movement, storage and disposal of waste produced by HSC & to minimi
Procedure No.: 3.4 - Conservation of Soil and Ground Water
1.0 Purpose To ensure the protection of soil and groundwater from spills of fuels, chemicals and ecologically toxic mat
Procedure No.: 3.5 - Water Supply & Conservation
1.0 Purpose To ensure that water resources are conserved. 2.0 Scope All HSC operation site. 3.0 Responsibilities 3.1 S