CONSTRUCTION PROCEDURES
Detailed procedures and guidelines for each type of construction work. (Login required)
Procedure No.: 1.8 - Contract HSE Performance Management Process
1.0 Purpose To ensure that Sub-Contractors are adequately controlled, their safety assured and that HSC’s reputation is
Procedure No.: 1.9 - HSE Audit & Inspection
1.0 Purpose To evaluate implementation of and compliance with the HSE management system and to ensure its continued effe
Chapter – 2 - OCCUPATIONAL HEALTH & SAFETY
PROCEDURE No.: 2.1 - INDUSTRIAL HYGIENE
1.0 Purpose To ensure that all employees, indirect personnel and others who may be affected by HSC activities are adequa
Procedure No.: 2.2 - Working At Height/Fall Prevention
1.0 Purpose To prevent injury and property damage when conducting work at height. 2.0 Scope This procedure is applicabl
Procedure No.: 2.3 - Confined Space Work
1.0 Purpose To ensure the safety of all personnel required to work in confined spaces 2.0 Scope All business locations
Procedure No.: 2.4 - Electrical Safety
1.0 Purpose The purpose of this standard is to define a set of mandatory requirements to ensure safety of personnel who
Procedure No.: 2.5 - Safe Lifting Operations
1.0 Purpose This procedure is prepared to ensure effective management on Lifting Operation and Lifting Accessories to mi
Procedure No.: 2.6 - Excavation Work
1.0 Purpose & Scope To ensure that excavation work is controlled and managed safely. 2.0 Definitions Competent Perso
Procedure No.: 2.7 - Personal Protective Equipment (PPE)
1.0 Purpose To ensure that personal protective equipment is controlled, issued and maintained in good condition to provi
Procedure No.: 2.8 - Energy Isolation (Lock out Tag out)
1.0 Purpose Energy Isolation procedures are followed in order to ensure the safety of employees at the workplace. These
Procedure No.: 2.9 - Permit to Work System
1.0 Introduction Permit-to-work (PTW) form an essential part of safe systems of work for various types tasks involving r